Industry solutions
Petrochemical and process gas
Fired heater optimisation and process gas monitoring differ from ordinary flue gas in range, hazardous area requirements and mounting location.
Confirm the hazardous area first
The zone at the mounting point determines equipment selection and wiring; confirm it before selection rather than afterwards.
Size the range for process swings
Size for the operating envelope, not the design point, so the instrument does not spend its life at the low end.
Keep the signal out of safety interlocks
When the analyzer only supports optimisation, do not wire it into a safety interlock, or an instrument fault becomes a plant upset.